40ft Vertical Loader for Aluminium Scrap Container Loading

A custom 40ft vertical loading solution for efficient aluminium scrap container loading from yard to terminal. Designed to support gravity-assisted loading and improved loading flow, with a reported ~40% reduction in loading time. Read the full project story below.

Recorded project results

More per container, less effort per load

These results were recorded at the Danish aluminium scrap facility after the custom 40ft vertical loader was put into operation.

Payload

30% more scrap per container

More material moved in every trip.

Speed

40% shorter loading time

Less time spent loading each container.

Labour

50% less labour

Fewer people needed at the loading point.

The challenge: loading more scrap without slowing the yard

For a Danish scrap processor, aluminium scrap moves from the processing yard to a terminal in 40ft shipping containers. With substantial volumes to handle, every loading cycle matters. The customer needed to fill containers more effectively, shorten loading time and reduce the number of people required at the loading point.

The existing horizontal method took time and left part of the available container capacity unused. That affected both yard throughput and the amount of material moved per container trip.

This loading challenge also appears with other scrap and recycling materials. VAKO’s guide to vertical container loading explains how loading from above changes the way loose material settles.

The solution

A custom 40ft vertical loader

VAKO designed and built a mobile vertical loader around the customer’s aluminium scrap flow. The system tilts the container into a vertical position so material can be loaded from above. Gravity helps the scrap settle throughout the available space. Wireless remote control lets the operator work at a distance, while hydraulic rear support legs stabilise the unit during loading. The design builds on VAKO’s experience with the MVL20 and was adapted for this 40ft operation. Pacton supplied the chassis.

Container loading process at the Danish aluminium scrap facility
Vertical loading as part of the customer's scrap-handling process.

Recorded at the customer site

Before and after the new loading method

Aspect Previous loading method VAKO 40ft vertical loader
Loading time per container 30–45 minutes 15–25 minutes
People required for loading 2–3 people 1 operator
Container volume utilisation 75–85% 95–100%

What these results mean in practice

The 40% shorter loading time is the recorded overall project result; the table shows the documented before-and-after loading-time ranges. The 30% increase in scrap per container was recorded separately from container volume utilisation. More material could be moved in each suitable container, within the applicable weight limits.

For another scrap yard, the business case starts with its own material, current payload, loading cycle and annual container volume. Explore the MVL40’s specifications, then use VAKO’s container loading ROI calculator for an initial estimate.

Delivery

Built and commissioned in Denmark

VAKO managed the design, construction and testing before delivering the unit to Denmark. On site, the team demonstrated the loading sequence, trained operators and carried out commissioning tests together with the customer. This connected the engineered machine with the customer’s everyday loading routine.

VAKO MVL40 mobile vertical loader for 40ft containers
The MVL40 developed for the Danish aluminium scrap project.
Your next step

Find out what your loading process could gain

Share your scrap type, current payload, loading time and annual container volume. VAKO’s engineers can assess your setup and discuss a suitable loading concept.

VAKO MVL40 vertical container loader for 40ft containers

Interested in a similar solution?

Contact us to discuss how VAKO can help you achieve your goals with a custom-engineered solution.